Jan 30, 2024
Origin to build 650 MWh battery next to gas plant in Victoria
Posted by Shailesh Prasad in category: energy
Energy utility Origin Energy says it will spend $400 million on a new big 650 MWh big battery to be built at the site of its main gas generator in Victoria.
The board approval for the Mortlake Power Station battery, to be sized at 300 MW and 650 MWh, follows approval for the first stage of the Eraring big battery in NSW – at the site of its soon-tobe-shuttered coal fired power station – and a growing list of other battery projects.
Origin has chosen US-based energy storage systems supplier Fluence to build the project. Site preparation is expected to begin in a couple of months and the battery will be operating in late 2026.